Daniel Mihoc Construction  White Logo

Baza Sarata Hotel Bacau Romania

  • Home
  • /
  • Baza Sarata Hotel Bacau Romania

Project Overview

Project Name :

Baza Sarata Hotel

Location :

Bacau, Romania

Date :

June 2026

Services Provided :
  • Main Contractors,
  • Concrete formworks, shuttering and rebar works
  • General Carpentry,
  • Roofing, slating, First & second fix carpentry works, including BM Trada Certified
  • Installation and maintenance including fireproofing as required,
  • Plastering, internal skimming and taping, external render,
  • External Wall Insulation and render, Drylining and stud partions,
  • MF ceilings and suspended demountable ceilings,
  • Floor and wall tiling works, including hardwood timber, marmoleum.
  • External Paving Systems such as granite, concrete etc. including permeable paving SUDS standards,
  • Traditional Block, Brickwork, Brick Slip, re-pointing works etc.
  • Façade Works, metal cladding, CP boarding and the like,
  • Labour supply ,
  • Contract Cleaning

Baza Sarata Hotel: Redefining Luxury Hospitality in Bacau, Romania

Daniel Mihoc Construction is proud to lead the construction of the Baza Sarata Hotel, a luxury 7-story hotel in Bacau, Romania, that promises to set a new benchmark for the hospitality industry. This ambitious project, which began in March 2024, is a 13,000-square-meter development featuring modern amenities such as a hydrotherapy spathree swimming pools62 luxurious rooms, and facilities like a restaurantcinema, and gym.

Scheduled for completion in mid-2026, the hotel combines cutting-edge construction techniques with sustainable practices, making it not only a stunning addition to Bacau’s skyline but also a model of modern, eco-conscious hospitality.

A Strong Foundation for a 7-Story Landmark

The Baza Sarata Hotel is supported by a robust foundation built over a basement parking facility that accommodates 120 cars. With meticulous attention to detail, Daniel Mihoc Construction has executed concrete formworksshuttering, and rebar works to ensure the structural integrity of this multi-story building. These early stages of construction laid the groundwork for a sustainable and long-lasting structure.

Luxury Meets Functionality: High-End Features of the Hotel

The Baza Sarata Hotel is designed to provide guests with an unparalleled experience, combining luxury amenities with functionality. Some of the key features include:

  • 62 spacious, elegantly designed rooms, each offering a blend of comfort and sophistication.
  • hydrotherapy spa, catering to guests seeking relaxation and rejuvenation.
  • Three swimming pools for leisure and fitness.
  • A fully equipped gym to support healthy lifestyles.
  • A state-of-the-art cinema, adding entertainment value to the hotel.
  • A world-class restaurant offering fine dining experiences.
  • Efficient reception and administrative areas for seamless operations.

Comprehensive Construction Workflow by Daniel Mihoc Construction

Structural Works
  • Concrete formworks, shuttering, and rebar works to ensure a durable and safe structure.
Carpentry and Roofing
  • General carpentry, including first and second fix carpentry for interior and exterior woodwork.
  • High-quality roofing and slating, ensuring longevity and a weatherproof structure.
  • BM Trada Certified Installation for fireproofing measures, meeting the highest safety standards.
Interior Finishes
  • Plasteringinternal skimming, and taping to create smooth and polished surfaces.
  • Installation of dryliningstud partitionsMF ceilings, and suspended demountable ceilings for functional and stylish interiors.
  • Floor and wall tiling, featuring premium materials like hardwood timbermarmoleum, and ceramic tiles.
External Works and Façade Finishes
  • External wall insulation and rendering for energy efficiency and a sleek exterior finish.
  • Façade works, including metal claddingCP boarding, and brick and blockwork for a modern and durable appearance.
  • External paving systems, such as granite and concrete, designed to meet SUDS (Sustainable Urban Drainage Systems) standards for eco-friendly water management.
Additional Services
  • Labour supply, ensuring a skilled workforce throughout the construction process.
  • Contract cleaning, ensuring the site is meticulously prepared for handover upon project completion.

Sustainability at the Core of the Project

Sustainability is a key focus for Daniel Mihoc Construction. The Baza Sarata Hotel integrates environmentally friendly features, such as permeable paving systems to support sustainable water drainage and external wall insulation to improve energy efficiency. These measures align with the growing demand for eco-conscious construction while maintaining the luxury standards expected of a high-end hotel.

Transforming Hospitality in Bacau

The Baza Sarata Hotel will not only elevate the hospitality experience in Bacau but also contribute to the local economy and community. By creating jobs during construction and upon completion, this project reflects Daniel Mihoc Construction’s commitment to supporting the regions in which it operates.

Upon completion in mid-2026, the hotel will stand as a landmark of luxury, innovation, and sustainability, redefining what it means to stay and relax in Bacau, Romania.

Daniel Mihoc Construction: Your Partner in Excellence

With a proven track record of delivering top-tier construction projects, Daniel Mihoc Construction is proud to lead the development of the Baza Sarata Hotel. From its strong foundation to its luxury finishes, every aspect of this project reflects our expertise, attention to detail, and commitment to quality.

We’re excited to bring this vision to life and look forward to unveiling a space that embodies both elegance and sustainability.

Experience the excellence of Daniel Mihoc Construction Contact us to learn more about our approach to creating sustainable communities in prime locations.