Building Ireland’s Digital Backbone: How Daniel Mihoc Construction Delivers Mission Critical Data Centers
Picture a countdown clock on a wall: T 30 days to “go live.” Racks are arriving, fiber is being terminated, and every commissioning script must pass the first time. That’s the reality of data center construction—and it’s where Daniel Mihoc Construction feels right at home.
We’ve built our reputation by doing the hard things well: precision concrete, fast, modular delivery, best in class MEP coordination, watertight façades, and bulletproof commissioning. Why? Because uptime isn’t a slogan; it’s a promise.
Why Ireland—and Why Now
Ireland has become one of Europe’s most important data center hubs. Hyperscale leaders—including Microsoft, Amazon Web Services, Google, and Meta—have invested billions of euro in Irish digital infrastructure over the past decade, clustering around Dublin and expanding to new regions as grids and planning evolve. Why they choose Ireland is clear:
- Connectivity: Dense fiber routes and major subsea cables into the EU and the US.
- Climate and Location: A cool, temperate climate that supports efficient cooling, plus strategic access to the European market.
- Talent and Track Record: Deep local expertise in design, construction, and operations for mission‑critical environments.
From Grange Castle and Blanchardstown to Clonee and Tallaght, Ireland’s campuses prove what’s possible at hyperscale—speed, resilience, and sustainability working together.
Our Edge: From Concrete to Commissioning
Data centers are built on details. We obsess over them.
- Concrete Formworks & Foundations: Precision tolerances for equipment pads, cable trenches, and vibration‑sensitive rooms. Flatness, levelness, and sequencing dialed in from day one to keep MEP trades moving without rework.
- Modular, Off‑Site, On‑Time: We integrate prefabricated MEP skids, modular power rooms, and pre‑terminated systems to compress schedules and improve quality. Less congestion on site, faster QA/QC, smoother handover.
- BIM‑Led Coordination: Clash‑free models, 4D sequencing, and shop‑drawing accuracy that de‑risks install and commissioning.
- Façade and Envelope Performance: Airtight, thermally efficient, maintenance‑friendly façades that protect uptime and reduce operating costs.
- Commissioning That Sticks: Factory witness tests, integrated systems testing, and “day‑in‑the‑life” failure simulations. If it isn’t repeatable, it isn’t finished.
The result: predictable schedules, clean handovers, and facilities that perform to spec from hour one.
Built‑In Sustainability: Smarter Power, Greener Cooling
Sustainability isn’t a line item; it’s an architecture. We design and deliver with operational efficiency and environmental performance in mind.
- On‑Site Renewables: Rooftop solar PV and canopy arrays integrated with smart power systems.
- Grid‑Friendly by Design: Battery Energy Storage Systems (BESS), demand response readiness, and staged energization strategies that work with the grid, not against it.
- Efficient Cooling: Free‑cooling, adiabatic systems, and liquid‑ready designs for high‑density compute without wasting water or power.
- Heat Re‑Use and Water Stewardship: Where feasible, we enable heat recovery for district heating partners and implement closed‑loop or hybrid cooling to reduce water intensity.
- Materials and Certifications: Low‑carbon concrete options, recyclable cladding, and pathways to LEED/BREEAM where required.
You’ll see the difference in your PUE, your ESG reports, and your community footprint.
What “Interactive Delivery” Means to Us
“Interactive” isn’t about gimmicks—it’s how we collaborate to remove uncertainty.
- Weekly model walks where stakeholders “tour” the build before steel is cut.
- Live dashboards for schedule, RFIs, and commissioning status.
- Early mock‑ups: from equipment pads and cable ladders to hot‑aisle containment—to align once and build once.
We make decisions visual, data‑driven, and fast—so critical paths stay critical, not chaotic.
Why Hyperscalers Choose Ireland—and Why Clients Choose Us
Hyperscalers choose Ireland for network, climate, and talent. Our clients choose Daniel Mihoc Construction for outcomes:
- Speed without shortcuts: Modular thinking, rigorous QA/QC, and trades that move in sync.
- Uptime engineered in: From switchgear to slab tolerances, we build for reliability first.
- Transparent control: One source of truth across design, procurement, install, and commissioning.
- A team you can put in front of your stakeholders: Clear communication, zero‑drama problem solving, and a culture of ownership.
When the go‑live clock is ticking, “nearly there” isn’t good enough.
Let’s be honest—concrete formworks aren’t the flashiest part of a building. They don’t get the Instagram likes or the glossy magazine covers. But ask any seasoned builder, and they’ll tell you: formworks are the backbone of every great structure. They’re the molds that shape concrete into everything from soaring columns to sweeping curves, and they demand precision, creativity, and a deep understanding of materials and engineering.
At Daniel Mihoc Construction, we treat formwork as both a science and an art. Our team meticulously plans each form, ensuring it’s not just strong and safe, but also efficient and sustainable. We use innovative systems and custom solutions to tackle even the most complex architectural visions—because when the formwork is right, everything else falls into place
.
A Human Team for a Digital World
Yes, we love BIM views and commissioning scripts—but this is still a people business. Our superintendents, foremen, formwork specialists, and commissioning engineers bring the kind of practical judgement you can’t buy off the shelf. If a crane lift needs a weather window or a pour sequence needs resequencing to keep chillers on program, we solve it before it becomes your problem.
We’ve learned that the fastest builds are the ones with the most trust: clear scopes, early alignment, and no surprises.
Building the Future, One Form at a Time
Whether you’re planning edge facilities, expanding a hyperscale campus, or upgrading an existing site for AI ready, high density loads, Daniel Mihoc Construction brings a complete playbook: concrete precision, modular speed, resilient envelopes, and commissioning that holds under pressure—plus sustainability that reads like a business case.
If you’re building in Ireland, you’re building in one of the world’s most competitive, scrutinized markets. That’s exactly where we thrive.
Ready to see what the future of construction can do for your next project? Let’s build something extraordinary—together.